CHALLENGE

 

An aerospace customer needed 60 molds within a 7 month time frame. Due to the design uniqueness and precise tolerances, a reliable partner was needed. The size of the project required each part to be measured and certified to the exact specifications. This had never been outsourced. 

 

TK MOLD SOLUTION

 

TK Mold & Engineering, Inc. became their one stop shop and accepted this large package of tools which included 60 molds that equaled out to be 260 individual pieces. We provided detailed CMM inspection reports on each piece. Each of the 60 molds needed to be delivered within 8 weeks which meant multiple molds delivered at once.

 

RESULTS

The customer was very happy because they did not have to split up the work between multiple suppliers. Their product remained at TK mold throughout the entire process. Constant feedback and timelines ensured consistent communication between both companies. They nicknamed us the “easy button”.